| The new disabled lift access is fitted to the Red Lion Inn |
| The lift shaft and emergency exit to the Red Lion Inn |
| The roofs of the Historic Core |
| Looking North over the Adelaide Flash with the restored Historic Core in the foreground |
| The Stove House 2 floor has begun to be repaired |
| Internal repairs of the Stove House 2 floor |
| A set of workman's clogs were discovered below the floorboards |
| The last of the repairs on the exterior of Stove House 2 |
| Stove House 5 across the remains of Pan 2 |
| Pan 5 has sat on a temporary scaffold for the last 5 years, ready to be lifted back into place |
| Pan 5 is lifted into place |
| Pan 5 sits on several steel girders |
| Pan 5 in position |
| The new path layout is established to the entrance of Stove House 5 |
| The entrance to Stove House 5 is now in place |
| The Link Bridge, between Stove House 5 and the Historic Core is beginning to be built |
| The Loading Bay repairs have begun |
| The last of the repairs on the Pump House chimney have been completed |